|
|
STATE: |
|
|
|
| STATE HIGHWAY EXPENDITURES |
|
| NOTE: This collection of information is required by 23 U.S.C. 104 (b) and 105 (b); and 23 C.F.R. 1.5 and 420.105(b). Public reporting burden is estimated to average 40 hours per response. The Guide data is used by FHWA in administering the Federal-Aid Highway Program; in assessing highway policies, programs and performance of the Nation’s highway transportation system; in identifying future highway system investment needs; and in making policy and program recommendations. Please note that an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control number for this collection is 2125-0032, which expires on XX/XX/XXXX. |
|
YEAR ENDING (mm/yy) |
|
|
|
|
|
|
| A. 1 Capital outlay on state system |
|
|
| a. Cost of acquiring right-of-way |
|
|
| b. Preliminary and construction engineering |
|
|
| c. Construction of highways |
|
|
| d. Total, A.1 |
|
|
| Report Total for Item A.2 on page 2 |
|
|
| A. 3 Highway and traffic services |
|
|
| a. Traffic control operations |
|
|
| b. Snow and ice removal |
|
|
| c. Other |
|
|
| d. Total, A.3 |
|
|
| A. 4 General administration and miscellaneous expenditures for State system |
|
|
| a. General administration and engineering |
|
|
| b. Highway planning and research |
|
|
| c. Total, A.4 |
|
|
| A. 5 Law Enforcement and Safety |
|
|
| a. Traffic supervision |
|
|
| b. Highway, traffic, and driver safety programs |
|
|
| c. Vehicle inspection |
|
|
| d. Vehicle size and weight enforcement |
|
|
| e. Total, A.5 |
|
|
| Expenditures on Other Roads and Streets |
A.7 Other State roads not on State System |
A.9 Locally administered roads |
| a. Capital outlay |
|
|
| b. Maintenance and Traffic Services |
|
|
| c. Administration |
|
|
| d. Total, A.7 and A.9 |
|
|
| Report Total for Items A.6, A.8 and A.10 on page 2 |
|
|
| Expenditures for Mass transit Purposes |
A.11 Direct Expenditures |
A.12 Grants-in-aid |
| a. Capital Outlay |
|
|
| b. Operations and Maintenance |
|
|
| c. Administration, Planning, and Research |
|
|
| d. Debt Service |
|
|
| e. Total, A.11 and A.12 |
|
|
| A.13 Expenditures for Nontransportation Purposes |
|
|
| a. Transfers to State General Fund for State general purposes |
|
|
| b. (Specify) |
|
|
| c. (Specify) |
|
|
| d. (Specify) |
|
|
| e. (Specify) |
|
|
| f. (Specify) |
|
|
| g. Total, A.13 |
|
|
| Form FHWA-532 (Rev. 12/2005) |
PREVIOUS EDITIONS OBSOLETE |
Excel |
| STATE: |
YEAR ENDING (mm/yy) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ALL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ITEM |
FUNDS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
(B) |
|
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
(I) |
(J) |
(K) |
(L) |
(M) |
(N) |
(O) |
(P) |
(Q) |
(R) |
(S) |
(T) |
(U) |
(V) |
(W) |
(X) |
(Y) |
(Z) |
(AA) |
(AB) |
(AC) |
(AD) |
(AE) |
(AF) |
(AG) |
(AH) |
(AI) |
(AJ) |
(AK) |
(AL) |
(AM) |
(AN) |
(AO) |
(AP) |
(AQ) |
(AR) |
(AS) |
(AT) |
(AU) |
(AV) |
(AW) |
(AX) |
(AY) |
| A. EXPENDITURES: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1. Capital outlay on State system |
|
0 |
|
|
A-1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2. Maintenance of State system |
|
0 |
|
|
A-2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3. Highway and traffic services on State system |
|
0 |
|
|
A-3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4. General administration and misc. expenditures for State system |
0 |
|
|
A-4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5. Law enforcement and safety |
|
0 |
|
|
A-5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6. Debt service on State obligations for highways: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| a. Paying agents fees, etc. |
|
0 |
|
|
A-6a |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| b. Interest |
|
0 |
|
|
A-6b |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| c. Retirement by current income (Net value. Relates to par value from FHWA-542, column 5) |
0 |
|
|
A-6c |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| d. Retirement by refunding (Net value. Relates to par value from FHWA-542, column 6) |
0 |
|
|
A-6d |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 7. Expenditures on Other State roads not on State system |
|
0 |
|
|
A-7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8. Transfers to toll facilities (specify facility) |
|
0 |
|
|
A-8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9. Expenditures by State on locally administered roads |
|
0 |
|
|
A-9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 10. Grants-in-aid to local governments |
|
0 |
|
|
A-10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 11. Expenditures by State on mass transportation |
|
0 |
|
|
A-11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 12. Grants-in-aid for mass transportation purposes |
|
0 |
|
|
A-12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 13. Expenditures for non-transportation purposes |
|
0 |
|
|
A-13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 14. Total expenditures (A.1 thru A.13) |
|
0 |
0 |
0 |
A-14 Total |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
| B. INTERFUND TRANSFERS, OUT (must equal item C, form FHWA-531) |
0 |
|
|
B. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| C. UNEXPENDED BALANCES AT END OF YEAR |
|
0 |
|
|
C. Balances |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| D. TOTAL FUNDS ACCOUNTED FOR (A-14 + B + C; must equal item D, form FHWA-531) |
0 |
0 |
0 |
D. Total All |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
| 2 |
|
|
3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|