Burden Calculation Tables

1157t14.xlsx

NSPS for Flexible Vinyl and Urethane Coating and Printing (40 CFR part 60, subpart FFF) (Renewal)

Burden Calculation Tables

OMB: 2060-0073

Document [xlsx]
Download: xlsx | pdf

Overview

Summary
Table 1
Table 2
Capital O&M
Respondents
Responses


Sheet 1: Summary

ICR Summary Information
Hours Per Response 16
Number of Respondents 43
Total Estimated Burden Hours 1,360
Total Estimated Costs $809,000
Annualized Capital O&M $623,000
Form Number Not Applicable

Sheet 2: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Flexible Vinyl and Urethane Coating and Printing (40 CFR Part 60, Subpart FFF) (Renewal)
























Burden Item (A) (B) (C) (D) (E) (F) (G) (H)



Person-hours per occurrence No. of occurrences per respondent per year Person- hours per respondent per year (C=AxB) Respondents per year a Technical person- hours per year
(E=CxD)
Management person-hours per year
(F=Ex0.05)
Clerical person-hours per year
(G=Ex0.1)
Cost ($) b



1. Applications N/A










2. Survey and Studies N/A










3. Reporting Requirements











A. Familiarize with rule requirement c 1 1 1 43 42.7 2.1 4.3 $6,719.23



B. Required Activities











New Sources









Labor Rates
Initial performance test d 280 1 280 0.33 92.4 4.62 9.24 $14,553.60

Technical $141.75
Repeat performance test d, e 280 0.2 56 0.33 18.5 0.92 1.85 $2,910.72

Management $172.41
C. Create Information See 3B








Clerical $71.36
D. Gather Existing Information See 3B










E. Write Report











New Sources











Notification of construction/reconstruction f 2 1 2 0.33 0.7 0.03 0.07 $103.95



Notification of initial performance test e, g 2 1.2 2.4 0.33 0.8 0.04 0.08 $124.75



Report of initial performance test See 3B










Existing Sources











Semiannual report h 4 2 8 43 341.3 17.06 34.13 $53,753.82



Subtotal for Reporting Requirements



571 $78,166



4. Recordkeeping Requirements











A. Familiarize with rule requirement See 3A










B. Plan Activities See 3B










C. Implement Activities See 3B










D. Develop Record System N/A










E. Time to Enter Information










Records of startup, shutdown, and malfunctions i 1.5 2 3 43 128 6.399 12.798 $20,157.68



Records of VOC, temperature, and CMS maintenance j 0.25 52 13 43 554.6 27.73 55.46 $87,349.95



F. Audits N/A










Subtotal for Recordkeeping Requirements



785 $107,508
Responses Hr/Response
TOTAL LABOR BURDEN AND COST (rounded) k



1,360 $186,000
86 16
TOTAL CAPITAL AND O&M COSTS (rounded) k






$623,000



GRAND TOTAL (rounded) k






$809,000
















Assumptions:



a We estimate that there are an average of 43 existing respondents, and it is estimated that 1 additional source will become subject over the next three years of this ICR.



b This ICR uses the following labor rates: Managerial $172.41 ($82.10+ 110%); Technical $141.75 ($67.50 + 110%); and Clerical $71.36 ($33.98 + 110%). These rates are from the United States Department of Labor, Bureau of Labor Statistics, December 2023, “Table 2. Civilian workers by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates are increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.



c We estimate it will take one hour to read and familiarize with the rule. This burden item applies to all sources.











d We estimate each performance test will take 280 hours to complete.











e We estimate 20 percent of respondents will need to repeat the initial performance test.











f We estimate it will take 2 hours to prepare the notification of construction/reconstruction.











g We estimate it will take 2 hours to prepare the notification of initial performance test.











h We estimate it will take 4 hours to compile data for semiannual reports.











i We estimate it will take 1.5 hours to record startups, shutdowns, and malfunctions.











j We estimate it will take 0.25 hours to record VOCs, temperatures, and CMS maintenance.











k Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.












Sheet 3: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Flexible Vinyl and Urethane Coating and Printing (40 CFR Part 60, Subpart FFF) (Renewal)






















Activity (A) (B) (C) (D) (E) (F) (G) (H)


EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant-year
(C=AxB)
Plants per year a Technical person- hours per year (E=CxD) Management person-hours per year (F=Ex0.05) Clerical person-hours per year (G=Ex0.1) Cost ($) b


Required Activities








Labor Rates
New Sources








Managerial $76.91
Initial performance tests c 24 1 24 0.33 7.92 0.40 0.79 $507
Technical $57.07
Repeat performance tests c, d 24 0.2 4.8 0.33 1.58 0.08 0.16 $101
Clerical $30.88
Report Review










New Sources










Notification of construction/reconstruction e 2 1 2 0.33 0.66 0.03 0.07 $42


Notification of initial startup f 0.5 1 0.5 0.33 0.17 0.01 0.02 $11


Notification of actual startup g 0.5 1 0.5 0.33 0.17 0.01 0.02 $11


Notification of initial test d, h 0.5 1.2 0.6 0.33 0.20 0.01 0.02 $13


Review test results d, i 0.5 1.2 0.6 0.33 0.20 0.01 0.02 $13


Existing Sources










Semiannual reports j 2 2 4 43 170.6 8.5 17.1 $10,922


TOTAL (rounded) k



209 $11,620














Assumptions:










a We estimate that an average of 43 existing respondents, and it is estimated that 1 additional source will become subject over the next three years of this ICR.


b This cost is based on the average hourly labor rate as follows: Managerial $76.91 (GS-13, Step 5, $48.07 + 60%); Technical $57.07 (GS-12, Step 1, $35.67 + 60%); and Clerical $30.88 (GS-6, Step 3, $19.30+ 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the Office of Personnel Management (OPM), 2024 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c We estimate it will take 24 hours to participate with each performance test.










d We estimate 20 percent of respondents will need to repeat the initial performance test.










e We estimate it will take 2 hours to review construction/reconstruction notifications.










f We estimate it will take 0.5 hours to review initial startup notifications.










g We estimate it will take 0.5 hours to review actual startup notifications.










h We estimate it will take 0.5 hours to review initial test notifications.










i We estimate it will take 0.5 hours to review test results.










j We estimate it will take 2 hours to review each semiannual report twice annually.










k Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 4: Capital O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs




(A) (B) (C) (D) (E) (F) (G)




Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M,
(E x F)





Temperature or feed rate monitor a $31,873 0.33 $10,518 $14,343 43 $611,876


CEPCI Index 2007: 499.6
Totals (rounded) b

$10,500

$612,000
$623,000
CEPCI Index 2024: 796.2
a Capital/Startup and O&M costs have been adjusted from 2007 $ to 2024 $ using the CEPCI CE Index.




b Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.





Sheet 5: Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports


(A) (B) (C) (D) (E)
Year Number of New Respondents 1 Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents
(E=A+B+C-D)
1 0.33 42.0 0 0 42.3
2 0.33 42.3 0 0 42.7
3 0.33 42.7 0 0 43.0
Average 0.33 42.3 0 0 42.7
1 New respondents include sources with constructed, reconstructed and modified affected facilities.

Sheet 6: Responses

Total Annual Responses
(A) (B) (C) (D) (E)
Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses
E=(BxC)+D
Notification of construction/ reconstruction 0.33 1 0 0.33
Notification of initial performance test 0.33 1.2 0 0.40
Semiannual Reports 43 2 0 85


Total (rounded) 86